Skip to content
Skip to main content
For builders

Building product sourcing for builders

Direct factory supply for residential builders, joinery, stairs, flooring, tiles, windows and tapware, landed compliant so you’re not rewriting the schedule to protect margin.

What gets in the way

The parts of supply that cost you money

  • 01

    Quoted high, bought higher

    You priced the job off a schedule that was current months ago. Every supplier increase since then comes out of your margin, not the contract.

  • 02

    Substitutions you didn’t choose

    The nominated product goes out of stock and a lesser one arrives. You get to explain it to the client.

  • 03

    Split deliveries

    Six suppliers, six delivery windows, and freight paid over and over on part loads.

  • 04

    Compliance chased after the fact

    Certification documents that don’t exist until the certifier asks for them, and product that can’t stay in the building.

How we work

What working with us looks like on a build

  • Priced off your schedule

    Send the finishes schedule and drawings. We come back with landed cost per line, itemised.

  • Locked specification

    What you approve is what’s manufactured. No packing-time substitutions.

  • One consolidated delivery

    Multiple factories packed into one container and unloaded where you need it.

  • Inspected in production

    Our own staff on the factory floor, with photographic reporting before anything ships.

  • Documentation pack

    Certification and test evidence collected as part of the job, ready for your certifier.

  • One phone number

    A licensed Australian tradesperson who understands a build program.

Imported is not the risk. Undocumented is.

Anyone can put a container on a boat. The reason imported product gets torn out of buildings is not where it was made. It is that nobody could produce the certificate when the certifier asked for it.

Compliance is specified before production starts, verified during it, and handed to you as a documentation pack with the delivery.

Engineered stone benchtops have been prohibited in Australia since 1 January 2025. We do not supply them under any circumstance. Where a stone-look benchtop is specified, we quote compliant alternatives, porcelain, sintered surfaces, natural stone or solid surface, and provide the silica content documentation for each.

Marks we specify to: WaterMark, WELS, RCM, AS 2047, AS 1288, AS/NZS 4386, AS 4586

Every order arrives with its own file: production inspection report, approved shop drawings, product certification, treatment and biosecurity paperwork, packing list and a landed cost breakdown.

Request the compliance guide

A written summary of the standards that apply to imported building products in Australia. Ask for it in the form and we’ll email it through, or call 0481 228 836.

  • WaterMark

    Plumbing and tapware

    Every tap, mixer, waste, cistern and flexible hose that touches drinking water carries a WaterMark certificate, with WELS registration for flow and water efficiency. Uncertified plumbing product cannot legally be installed in Australia, and a plumber who fits it wears the liability.

  • RCM

    Electrical and lighting

    Lighting, fans, transformers and controls are supplied with a Regulatory Compliance Mark, an Australian responsible supplier on record, and the electrical safety and EMC test reports behind the mark. Our director is a licensed NSW electrical contractor, so this is checked by someone who signs off installations.

  • AS 2047

    Windows and external doors

    External windows and doors are tested and labelled to AS 2047 for water penetration, air infiltration and structural wind load against your site’s wind classification. Without it, no certifier will pass the building envelope.

  • AS 1288

    Glass and glazing

    Glass selection, thickness and grade in accordance with AS 1288, with Grade A safety glass where the code requires it, doors, low-level glazing, wet areas, balustrades and overhead applications.

  • AS/NZS 4386

    Domestic kitchen assemblies

    Cabinetry built to the material, moisture-resistance and construction requirements of AS/NZS 4386, with low-formaldehyde E0 or E1 board and documented hardware ratings.

  • AS 1657 / NCC

    Stairs and balustrades

    Staircases set out to NCC rise, going and going-to-rise limits, with balustrade heights, gap limits and load resistance verified before manufacture. Staircase geometry is the single most common cause of an imported product being rejected on site.

  • ISPM 15

    Timber and quarantine

    All timber packaging, pallets, crating and dunnage heat-treated or fumigated and stamped to ISPM 15. Product is packed to survive a biosecurity inspection so containers are not held, treated at your cost or re-exported.

  • Slip and fire

    Flooring, tiles and linings

    Slip resistance classified to AS 4586 for wet areas, ramps and external paving, and fire hazard properties documented for linings where the NCC calls for a group number.

Project intake

Send us your finishes schedule.

We’ll price it line by line as a landed cost so you can compare it against what you’re paying now, before you commit to anything.

01Your details

02The job

What are you building?
When do you need it done by?

Ready with plans and schedules? Go straight to the full project brief.